CONTAMINANT REMEDIATION

Exhibition Hall 15, Leipzig
Construction project: Partial demolition and pollutant remediation of exhibition hall 15
Client: Zweirad-Center Stadler GmbH
Location: Exhibition Hall 15, Old Exhibition Grounds Leipzig
Construction time: 12 months
Scope of services:
-
Dismantling of internal reinforced concrete gallery and structural and non-structural masonry parts using a crawler excavator
-
Remediation of 5,000 m² of weakly bound asbestos-containing roof structure of shed roof without load transfer to roof areas between riders
Technical and device-specific features:
-
Use of 30-40 tonne crawler excavators
-
Up to 30 pollutant remediation specialists
-
Specially designed lightweight construction for the construction of the black area to minimize load input into roof areas between riders
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
---|---|---|---|---|---|---|---|---|
![]() |