Stade nuclear power plant

Dismantling the dome
Client: Kernkraftwerk Stade GmbH and Co. oHG
Place of execution: Stade
Construction period: June 2021- September 2022
Scope of services:
-
Mechanical demolition of 5000 t high-strength concrete structures with remote-controlled electric excavators
-
Processing of concrete into concrete rubble 0 mm - 20 mm with compact crusher and filling in big bags
-
Dismantling 300 t of reinforcing steel to BigBag size
-
Static monitoring of the stability of the containment (safety vessel)
Technical and device-specific features:
-
30 t remote-controlled electric excavator (compressed to the internal dimensions of an ISO 20' container to enable transport between control areas)
-
All attachments (3 t demolition hammer, demolition shears, pulverizer, sorting grapple and backhoe bucket) can be quickly changed with OilQuick
-
Compact crusher including magnetic separator, screen and big bag filling station
-
Electronically operated skid steer loader and forklift
-
All work takes place in the radiation protection area according to § 36 StrlSchV (controlled area)
-
Static monitoring using vibration measurements, strain gauges and deformation measurements
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
---|

AVR JÜLICH

Decontamination of reinforced concrete structures in the experimental nuclear power plant (AVR) Jülich
Construction project: Decontamination of surfaces, Building 09.20v
Client: JEN Jülich Nuclear Waste Management Company Ltd.
Place of execution: Experimental nuclear power plant, Jülich Research Centre
Construction time: 10 months
Scope of services:
-
Low-aerosol shaving (surface removal) of 1500 m² of high-strength reinforced concrete structures with a removal depth of up to 10 mm in the radiation protection area according to Section 36 of the Radiation Protection Ordinance (controlled area)
-
Remediation of weakly bound asbestos in the controlled area in compliance with TRGS 519
-
removal of all interfering edges (1000 linear meters of anchor rails, dowels, wall pipes)
Technical and device-specific features:
-
Use of mechanically guided milling tools on wall, floor and ceiling milling technology
-
Work in compliance with StrlSchV and TRGS 519
-
Working with forced-ventilated protective suits
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
---|

VKTA ROSSENDORF

Demolition of the reactor hall of the VKTA Rossendorf
Construction project: VKTA – Dismantling RFR – LOT 9.01 – Demolition of Building 790
Client: VKTA Rossendorf eV
Place of execution: Rossendorf
Construction time: 12 months
Scope of services:
-
Demolition of laboratory building16,000 m³ uR
-
Demolition of reactor hall 15,000 m³ uR
-
Demolition control room 2,000 m³ uR
-
10 areas with suspected radioactive material
Technical and device-specific features:
-
Remaining gutting and demolition in accordance with the Radiation Protection Ordinance (StrlSchV)
-
Pre- and post-examination of employees for fitness for work in
-
radiation-contaminated area
-
Continuous measurement of radiation exposure with a body-worn dosimeter
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
---|