top of page

CANCELLATION

Schatten auf Betonwand

Urban redevelopment is as old as cities themselves. Therefore, buildings and facilities are repeatedly subjected to demolition, demolition, dismantling, and gutting. But the dismantling and dismantling of industrial facilities will also always be an issue.

 

Reinwald GmbH is a specialist company that handles the most complex demolitions and partial dismantling of buildings or parts of buildings. We utilize state-of-the-art demolition equipment with a reach of up to 50 meters. Our personnel are trained and appropriately qualified.

 

Our range of services includes:

 

  • Complete project management for demolition, dismantling, blasting, dismantling and gutting

  • Dismantling including demolition of buildings and building parts

  • Mechanical demolition with a range of 50m

  • Blasting of buildings and industrial facilities

 

For further questions please contact us at

leipzig@reinwald.com

 

Staudenhof
Schatten auf Betonwand

Dismantling Staudenhof

Demolition/Dismantling/Contaminant Remediation

Reinwald GmbH has been awarded the contract for the remediation of pollutants, gutting, dismantling and disposal services as a total demolition down to the foundation depth of the structures, which also includes the surface paving (roads, paths, squares), canals, shafts, underground cables and power lines.

The “Staudenhof” building was constructed in the 1970s and is located at Am Alten Markt 10 / Am Kanal 48/49, in the northern inner city district of Potsdam.

The property has an area of approximately 9,000 m² and is in the immediate vicinity of the listed St. Nicholas Church (to the south) and the listed main post office building (to the north).

 

The demolition work is taking place in the confined inner-city space. Due to this, five floors will initially be dismantled using cranes. The remaining building will then be dismantled, crushed, and removed using large-scale machinery such as long-front excavators.

 

 

IMG_8949.jpg

Client: Redevelopment Agency Potsdam GmbH - ProPotsdam

Location of execution: Demolition of Staudenhof Potsdam

Construction time: 17 months

 

Technical data:

Dismantling / demolition of the following systems:

Front section Block II, Block I and II

 

The systems essentially consist of the following components:

  • Prefabricated constructions (panel construction)

  • Reinforced concrete structures on strip and individual foundations

 

Facilities to be dismantled will be remediated for pollutants, gutted, and dismantled or mechanically demolished in accordance with TRGS 519. All resulting waste will be properly disposed of or recycled.

 

Scope of services in numbers:

Dismantling/demolition of reinforced concrete approx. 30,000 t

Dismantling/demolition of brick rubble approx. 4,000 t

Demolition of building approx. 51,900 m³uR

Deep debris removal approx. 2,000 m³

IMG_9589
IMG_8949
IMG_8800
IMG_8170
IMG_8291
Schatten auf Betonwand
Projekt Abbruch

Chimney demolition at Leipzig municipal utilities

Demolition/blasting

IMG_5325 Copy.jpeg

Client: Stadtwerke Leipzig GmbH
Place of execution: Leipzig
Construction time: 7 months

 

Scope of services:

  • Construction of an 8,500 m³ fall bed

  • Drilling of 1,500 boreholes using core drilling machines

  • Attachment of approximately 100 kg of explosives by our partner company Thüringer Sprenggesellschaft mbH

  • Attaching covers to the blasting mouths to minimize stray airborne damage

  • Demolition of 3,000 t foundation

  • Removal of the fall bed approx. 15,500 t, and a total of approx. 8,500 t of concrete

 

Technical and device-specific features:

  • Application of a so-called 3-fold blast folding, due to limited space around the 170 m high chimney

  • Blasting levels at 120 m, 35 m and at ground level

 

Schatten auf Betonwand

Dismantling of the TDI and TDA plants at the BASF Schwarzheide chemical plant

Dismantling/demolition

20220309_100133.jpg
IMG_8474.jpg

Client: BASF Schwarzheide GmbH
Location: BASF Chemical Plant in Schwarzheide
Construction Period: 12 months

Scope of services:

Reinwald GmbH has been contracted for the dismantling of the TDI and TDA plants as a total demolition down to the foundation depth of the structures. This also includes the removal of surface reinforcements (roads, pathways, and squares), channels, shafts, underground cables, and power lines.

The TDI and TDA plants were previously used for the production of toluene diisocyanate (TDI) via the precursor stages dinitrotoluene (DNT) and toluene diamine (TDA), utilizing carbon monoxide and chlorine gases—both essential in the production of plastics (polyurethanes).

The dismantling work is carried out partially under confined space conditions, in areas adjacent to operational facilities and pipe bridges, with strict adherence to occupational safety regulations and protection of the remaining installations.

 

The plants are being dismantled using both crane-assisted deconstruction and heavy machinery, such as:

  • Volvo EC 480 tracked excavator with a 30 m high-reach boom

  • Hitachi ZX 870 XXL with a 50 m high-reach boom

 

Technical Data:

Dismantling / Deconstruction of the following facilities:

  • Phosgene plant

  • HCl absorption unit

  • TDI Plant 1 containment

  • TDI Plant 2

  • TDI interim storage

  • Chlorine evaporation unit

  • Chlorine storage

  • Chlorine destruction facility

  • TDA plant

  • TDA storage

  • DNT storage

  • Raw material storage

 

Structural Components of the Plants:

The facilities mainly consist of:

  • Steel structures on individual foundations, tank storage, and wastewater collection pits

  • Apparatus structures as steel constructions on individual foundations

  • Reinforced concrete buildings with integrated steel apparatus structures

  • Production frameworks on slab foundations

  • Massive buildings with tank storage in reinforced concrete basins

 

The facilities to be dismantled are decontaminated, stripped, and dismantled in compliance with TRGS regulations or mechanically demolished. All waste materials are professionally disposed of or recycled.

Key Figures:

  • Dismantling / Deconstruction of steel structures: approx. 2,000 t

  • Dismantling / Deconstruction of process equipment scrap: approx. 1,000 t

  • Demolition of buildings: approx. 20,000 m³ building volume

  • Deep debris removal: approx. 10,000 m³

20220309_100133
IMG_8477
Foto 13.10.21, 13 32 14
20220207_141326
Schatten auf Betonwand

Demolition of the Krampnitz barracks

Dismantling and renovation

IMG_7171.jpg

Client: ProPotsdam GmbH
Location: Potsdam, Krampnitz
Construction period: 16 months

Scope of services:

  • Renovation of 25,000 m² of asbestos cement roofing and 10,000 m² of asbestos-containing roofing felt.

  • Complete demolition of 41 former barracks buildings and structures after decontamination and hazardous material removal (250,000 m³ building volume).

  • 40,000 m³ deep debris removal (concrete).

  • Disposal of approximately 80,000 t of various contaminated soils.

  • 80,000 m² of trees to be felled and stumps removed.

  • Explosive ordnance disposal supervision.

  • Crushing of 50,000 t of concrete into reusable recycled material.

 

Technical and Equipment-Specific Features:

  • 30 - 50 t tracked excavators (some with bulletproof glass).

  • 17 – 20 m³ articulated dump trucks.

  • 20 t bulldozer.

  • Up to 30 employees on site.

IMG_7244
IMG_7171
Krampnitz mit Himmel 2
IMG_7211
IMG_7360
Schatten auf Betonwand

University of Applied Sciences in Potsdam city center

Construction project: Demolition of the former Potsdam University of Applied Sciences
Client: ProPostdam GmbH
Location: Potsdam, city center
Construction time: 12 months

 

Scope of services:

  • Complete demolition of the former university of applied sciences with above-ground enclosed space of 80,000 m³ after completed gutting and pollutant remediation

  • Deep demolition of 5,000 m³ of solid mass after installation of a beam-pile shoring and a retaining wall

  • Technical and device-specific features:

  • 30-40 ton excavator

  • Crawler excavator with long front boom with a reach height of up to 30 meters

  • Up to 30 employees in action

 

IMG_1494
IMG_0929
IMG_0928
Schatten auf Betonwand

Bridge demolition at Auensee pier

Construction project: Demolition of the Auensee pier

Client: City of Leipzig

Place of execution: Leipzig

Construction time: 6 weeks

 

Scope of services:

  • Complete demolition of a reinforced concrete bridge with a length of approximately 100 m

 

Technical and device-specific features:

  • 30 tonne crawler excavator on pontoons

  • Implementation taking into account nature conservation

  • Protective measures in the riverbank area and on the track system of the park railway

 

image4
image3
image2