CANCELLATION

Urban redevelopment is as old as cities themselves. Therefore, buildings and facilities are repeatedly subjected to demolition, demolition, dismantling, and gutting. But the dismantling and dismantling of industrial facilities will also always be an issue.
Reinwald GmbH is a specialist company that handles the most complex demolitions and partial dismantling of buildings or parts of buildings. We utilize state-of-the-art demolition equipment with a reach of up to 50 meters. Our personnel are trained and appropriately qualified.
Our range of services includes:
-
Complete project management for demolition, dismantling, blasting, dismantling and gutting
-
Dismantling including demolition of buildings and building parts
-
Mechanical demolition with a range of 50m
-
Blasting of buildings and industrial facilities
For further questions please contact us at

Dismantling Staudenhof
Demolition/Dismantling/Contaminant Remediation
Reinwald GmbH has been awarded the contract for the remediation of pollutants, gutting, dismantling and disposal services as a total demolition down to the foundation depth of the structures, which also includes the surface paving (roads, paths, squares), canals, shafts, underground cables and power lines.
The “Staudenhof” building was constructed in the 1970s and is located at Am Alten Markt 10 / Am Kanal 48/49, in the northern inner city district of Potsdam.
The property has an area of approximately 9,000 m² and is in the immediate vicinity of the listed St. Nicholas Church (to the south) and the listed main post office building (to the north).
The demolition work is taking place in the confined inner-city space. Due to this, five floors will initially be dismantled using cranes. The remaining building will then be dismantled, crushed, and removed using large-scale machinery such as long-front excavators.

Client: Redevelopment Agency Potsdam GmbH - ProPotsdam
Location of execution: Demolition of Staudenhof Potsdam
Construction time: 17 months
Technical data:
Dismantling / demolition of the following systems:
Front section Block II, Block I and II
The systems essentially consist of the following components:
-
Prefabricated constructions (panel construction)
-
Reinforced concrete structures on strip and individual foundations
Facilities to be dismantled will be remediated for pollutants, gutted, and dismantled or mechanically demolished in accordance with TRGS 519. All resulting waste will be properly disposed of or recycled.
Scope of services in numbers:
Dismantling/demolition of reinforced concrete approx. 30,000 t
Dismantling/demolition of brick rubble approx. 4,000 t
Demolition of building approx. 51,900 m³uR
Deep debris removal approx. 2,000 m³
![]() | ![]() | ![]() | ![]() | ![]() |
---|

Chimney demolition at Leipzig municipal utilities
Demolition/blasting

Client: Stadtwerke Leipzig GmbH
Place of execution: Leipzig
Construction time: 7 months
Scope of services:
-
Construction of an 8,500 m³ fall bed
-
Drilling of 1,500 boreholes using core drilling machines
-
Attachment of approximately 100 kg of explosives by our partner company Thüringer Sprenggesellschaft mbH
-
Attaching covers to the blasting mouths to minimize stray airborne damage
-
Demolition of 3,000 t foundation
-
Removal of the fall bed approx. 15,500 t, and a total of approx. 8,500 t of concrete
Technical and device-specific features:
-
Application of a so-called 3-fold blast folding, due to limited space around the 170 m high chimney
-
Blasting levels at 120 m, 35 m and at ground level

Dismantling of the TDI and TDA plants at the BASF Schwarzheide chemical plant
Dismantling/demolition


Client: BASF Schwarzheide GmbH
Location: BASF Chemical Plant in Schwarzheide
Construction Period: 12 months
Scope of services:
Reinwald GmbH has been contracted for the dismantling of the TDI and TDA plants as a total demolition down to the foundation depth of the structures. This also includes the removal of surface reinforcements (roads, pathways, and squares), channels, shafts, underground cables, and power lines.
The TDI and TDA plants were previously used for the production of toluene diisocyanate (TDI) via the precursor stages dinitrotoluene (DNT) and toluene diamine (TDA), utilizing carbon monoxide and chlorine gases—both essential in the production of plastics (polyurethanes).
The dismantling work is carried out partially under confined space conditions, in areas adjacent to operational facilities and pipe bridges, with strict adherence to occupational safety regulations and protection of the remaining installations.
The plants are being dismantled using both crane-assisted deconstruction and heavy machinery, such as:
-
Volvo EC 480 tracked excavator with a 30 m high-reach boom
-
Hitachi ZX 870 XXL with a 50 m high-reach boom
Technical Data:
Dismantling / Deconstruction of the following facilities:
-
Phosgene plant
-
HCl absorption unit
-
TDI Plant 1 containment
-
TDI Plant 2
-
TDI interim storage
-
Chlorine evaporation unit
-
Chlorine storage
-
Chlorine destruction facility
-
TDA plant
-
TDA storage
-
DNT storage
-
Raw material storage
Structural Components of the Plants:
The facilities mainly consist of:
-
Steel structures on individual foundations, tank storage, and wastewater collection pits
-
Apparatus structures as steel constructions on individual foundations
-
Reinforced concrete buildings with integrated steel apparatus structures
-
Production frameworks on slab foundations
-
Massive buildings with tank storage in reinforced concrete basins
The facilities to be dismantled are decontaminated, stripped, and dismantled in compliance with TRGS regulations or mechanically demolished. All waste materials are professionally disposed of or recycled.
Key Figures:
-
Dismantling / Deconstruction of steel structures: approx. 2,000 t
-
Dismantling / Deconstruction of process equipment scrap: approx. 1,000 t
-
Demolition of buildings: approx. 20,000 m³ building volume
-
Deep debris removal: approx. 10,000 m³
![]() | ![]() | ![]() | ![]() |
---|

Demolition of the Krampnitz barracks
Dismantling and renovation

Client: ProPotsdam GmbH
Location: Potsdam, Krampnitz
Construction period: 16 months
Scope of services:
-
Renovation of 25,000 m² of asbestos cement roofing and 10,000 m² of asbestos-containing roofing felt.
-
Complete demolition of 41 former barracks buildings and structures after decontamination and hazardous material removal (250,000 m³ building volume).
-
40,000 m³ deep debris removal (concrete).
-
Disposal of approximately 80,000 t of various contaminated soils.
-
80,000 m² of trees to be felled and stumps removed.
-
Explosive ordnance disposal supervision.
-
Crushing of 50,000 t of concrete into reusable recycled material.
Technical and Equipment-Specific Features:
-
30 - 50 t tracked excavators (some with bulletproof glass).
-
17 – 20 m³ articulated dump trucks.
-
20 t bulldozer.
-
Up to 30 employees on site.
![]() | ![]() | ![]() | ![]() | ![]() |
---|

University of Applied Sciences in Potsdam city center
Construction project: Demolition of the former Potsdam University of Applied Sciences
Client: ProPostdam GmbH
Location: Potsdam, city center
Construction time: 12 months
Scope of services:
-
Complete demolition of the former university of applied sciences with above-ground enclosed space of 80,000 m³ after completed gutting and pollutant remediation
-
Deep demolition of 5,000 m³ of solid mass after installation of a beam-pile shoring and a retaining wall
-
Technical and device-specific features:
-
30-40 ton excavator
-
Crawler excavator with long front boom with a reach height of up to 30 meters
-
Up to 30 employees in action
![]() | ![]() | ![]() |
---|

Bridge demolition at Auensee pier
Construction project: Demolition of the Auensee pier
Client: City of Leipzig
Place of execution: Leipzig
Construction time: 6 weeks
Scope of services:
-
Complete demolition of a reinforced concrete bridge with a length of approximately 100 m
Technical and device-specific features:
-
30 tonne crawler excavator on pontoons
-
Implementation taking into account nature conservation
-
Protective measures in the riverbank area and on the track system of the park railway
![]() | ![]() | ![]() |
---|